Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 3 de 3
Filter
Add filters








Language
Year range
1.
Chinese Journal of Practical Nursing ; (36): 1192-1196, 2016.
Article in Chinese | WPRIM | ID: wpr-489906

ABSTRACT

Specialization development of nursing has increasing demand for nursing staff. Competency model is a professional way for the person-post matching, which may replace the job analysis as a new research direction in nursing human resource management. In this paper, the validation and application of nursing competency model were reviewed from the perspectives of competency model, to discuss the thought and method of verifying competency model, so as to lay the foundation for the clinical application of nursing competency model, and promote the rapid development of nursing.

2.
Chinese Journal of Practical Nursing ; (36): 905-908, 2016.
Article in Chinese | WPRIM | ID: wpr-486421

ABSTRACT

Objective To explore the effect of team resource management mode in reducing the door-to-needle time (DNT) of acute ischemic stroke. Methods A total of 272 acute ischemic stroke patients admitted to our hospital from January to December 2014 were set as the observation group. The observation group adopted the team resource management mode which was composed of emergency triage nurses, thrombolysis group nurses, emergency CT nurses, emergency intensive care nurses, interventional radiology nurses, cerebrovascular medicine nurses and rehabilitation medicine nurses. Another 264 acute ischemic stroke patients admitted to our hospital from January to December 2013 were named as the control group who was given traditional emergency treatment mode. The DNT, the activities of daily living and the nursing service satisfaction of patients were compared between the observation group and the control group. Results The DNT, Barthel index and the nursing service satisfaction of patients in the observation group were (44.93 ±11.47) min, 65.26 ±21.36, 93.39% (240/257), which were better than those of the control group, (111.99±11.10) min, 39.53±20.56, 80.41%(197/245), the differences were significant (t=115.516, 14.559, χ2=18.740, P < 0.01). Conclusions The team resource management mode is an effective tool to shorten the DNT, promote the recovery of patients and improve the quality of patients′life.

3.
Journal of Interventional Radiology ; (12): 926-928, 2014.
Article in Chinese | WPRIM | ID: wpr-473934

ABSTRACT

Objective To discuss the nursing cooperation for patients with severe aortic stenosis who are receiving transcatheter aortic valve replacement using balloon-expandable aortic valve stent. Methods Percutaneous interventional transcatheter aortic valve replacement was employed in 9 patients with severe aortic stenosis. Active preoperative preparation, sufficient psychological care, close observation of vital signs and effective surgery cooperation during the operation were carried out. The clinical results were analyzed. Results Successful operation was accomplished in all the nine patients. After the surgery, all patients were in good condition, and no nursing-related complications occurred. Conclusion Correct understanding of the cooperation with the procedure of transcatheter aortic valve replacement using balloon-expandable aortic valve stent, excellent preoperative psychological care and active preoperative preparation, etc. are the most important things to ensure a successful surgery.

SELECTION OF CITATIONS
SEARCH DETAIL